Complete Shop Remodel #2: Getting There

Well, here’s a quick update on the remodel. I’ve got all the walls insulated with r19 batts. I also have all of the rafter vents installed and the wiring roughed in. Tonight I’m in the process of stapling all the flaps on the insulation to form the vapor barrier. You can already tell a major difference with just the walls insulated. I wasn’t sure what to do about the void between the top plate of the wall and the rafter vents, until it dawned on me to just stuff leftover insulation in there and that worked out great. Tomorrow morning my buddy Billy and I are going to start putting up the plastic on the ceiling so the loose fill insulation can be blown in. After all that’s done, it’s just a matter of installing osb on the ceiling and all walls. Then all I’ll like is paint and wiring as well as reinstalling all the lights. Boy, speaking of osb, I’m getting it for 4.97 a sheet, which I couldn’t believe. Anyway, until next time…

Share:
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • StumbleUpon
This entry was posted in Shop Setup and tagged . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>